Potrero SB Ramp over I 19 NB

0.3 mi N Jct B19 · County 023, Arizona · Built 1969 · 1 Lanes · 4,010 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
01302
Year Built
1969
Reconstructed
2010
Length
35.4 m (116.1 ft)
Max Span
32.9 m
Width
10.3 m (33.8 ft)
Lanes
1
Daily Traffic
4,010
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.