SB 19; FAP 001 over Potrero Canyon
4.3 mi N Jct SR 82 · County 023, Arizona · Built 1949 · 5 Lanes · 10,555 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
31.3932, -110.9555
This bridge is in worse condition than 65.7% of bridges in County 023. The average bridge in Arizona is 0 years old; this one is 77 years old.
Nearby Bridges
I 19; NB over Country Club Rd
Built 1969
Potrero SB Ramp over I 19 NB
Built 1969
I 19; SB over Country Club Rd
Built 1969
I 19 WFR over Potrero Creek
Built 1989
Gold Hill over Nogales Creek
Built 1961
Old Tucson Road over Wash
Built 1931
W Produce Row over Nogales Wash
Built 1900
I 19; NB over Frank Reed Rd
Built 1969
I 19; SB over Frank Reed Rd
Built 1969
I 19; NB-SB-E & WF over Alamo Canyon
Built 1949
Bridge Details
- Structure #
- 00325
- Year Built
- 1949
- Reconstructed
- 1969
- Length
- 28.7 m (94.2 ft)
- Max Span
- 7.6 m
- Width
- 27.1 m (88.9 ft)
- Lanes
- 5
- Daily Traffic
- 10,555
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.