I 40; WB over Welch Road

5.4 mi E Jct SR 89 · County 005, Arizona · Built 1965 · 3 Lanes · 8,531 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

35.2165, -112.3785

This bridge is in worse condition than 71.4% of bridges in County 005. The average bridge in Arizona is 0 years old; this one is 61 years old.

Nearby Bridges

Bridge Details

Structure #
00812
Year Built
1965
Length
24.4 m (80.1 ft)
Max Span
9.1 m
Width
15 m (49.2 ft)
Lanes
3
Daily Traffic
8,531
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.