I 40; WB over Johnson Canyon

2.5 mi E Jct SR 89 · County 005, Arizona · Built 1955 · 2 Lanes · 8,187 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
00441
Year Built
1955
Length
15.8 m (51.8 ft)
Max Span
7.6 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
8,187
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.