IRR BIA RTE 3 over HINT CANYON

39.1 KM E OF COOLIDGE DAM · County 009, Arizona · Built 1929 · 2 Lanes · 120 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
4
Poor

Condition Ratings

ComponentRatingDescription
Deck 4 Poor
Superstructure 4 Poor
Substructure 4 Poor

Location

33.177258, -110.176033

This bridge is in worse condition than 96.1% of bridges in County 009. The average bridge in Arizona is 0 years old; this one is 97 years old.

Nearby Bridges

Bridge Details

Structure #
00000000000H196
Year Built
1929
Length
20.1 m (65.9 ft)
Max Span
6.7 m
Width
7 m (23 ft)
Lanes
2
Daily Traffic
120
Material
Concrete
Design
Slab
Owner
Bureau of Indian Affairs
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$1,260,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.