IRR BIA RTE 3 over OAK DRAW
36.3 KM E OF COOLIDGE DAM · County 009, Arizona · Built 1929 · 2 Lanes · 120 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
1
Imminent Failure
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 1 | Imminent Failure |
| Substructure | 4 | Poor |
Location
33.179261, -110.205242
This bridge is in worse condition than 99.4% of bridges in County 009. The average bridge in Arizona is 0 years old; this one is 97 years old.
Nearby Bridges
IRR BIA RTE 3 over CALVA WASH
Built 1929
IRR BIA RTE 3 over CALVA DRAW
Built 1929
IRR BIA RTE 3 over WASH
Built 1929
IRR BIA RTE 3 over GULCH
Built 1929
IRR BIA RTE 3 over GULCH
Built 1929
IRR BIA RTE 3 over HINT CANYON
Built 1929
IRR US 70 over Wash
Built 1956
IRR US 70 over Five Mile Wash
Built 1956
IRR US 70 over Wash
Built 1956
IRR BIA RTE 3 over BASIN WASH
Built 1929
Bridge Details
- Structure #
- 00000000000H194
- Year Built
- 1929
- Length
- 46.2 m (151.6 ft)
- Max Span
- 9.8 m
- Width
- 7 m (23 ft)
- Lanes
- 2
- Daily Traffic
- 120
- Material
- Concrete
- Design
- Tee Beam
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $2,020,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.