CHIPPEWA AVE over CLEAR CREEK
0.5 KM W OF BADGER RD · County 090, Alaska · Built 2000 · 2 Lanes · 25 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
64.8128, -147.5825
This bridge is in worse condition than 50% of bridges in County 090. The average bridge in Alaska is 0 years old; this one is 26 years old.
Nearby Bridges
RICHARDSON HIGHWAY over CHANNEL B RICHARDSON HWY
Built 2002
SB-BADGER RD RAMP over CHANNEL B SB-BADGER RAMP
Built 2002
FRONTAGE ROAD over CHANNEL B NB FRONTAGE RD
Built 2002
RICHARDSON HIGHWAY over BADGER LOOP U.C.
Built 2002
RICHARDSON HIGHWAY over BADGER LOOP RD U.C.
Built 1986
RIVER ROAD over CHENA RIVER
Built 2020
RICHARDSON HIGHWAY over RICH HWY OH MP 359 NB
Built 2023
RICHARDSON HIGHWAY over RICH HWY OH MP 359 SB
Built 2024
RIVER ROAD over CHENA RIVER
Built 1988
PARKS-AK HWY RAMP over E-N LOOP RAMP
Built 1994
Bridge Details
- Structure #
- DAPPACWAI0XBRIF
- Year Built
- 2000
- Length
- 14.5 m (47.6 ft)
- Max Span
- 2.3 m
- Lanes
- 2
- Daily Traffic
- 25
- Material
- Steel
- Design
- Culvert
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $1,000
- Total Project Cost
- $2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.