RIVER ROAD over CHENA RIVER
INT OF GAFFNEY RD · County 090, Alaska · Built 1988 · 2 Lanes · 1,500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
64.834547, -147.651478
This bridge is in worse condition than 16.1% of bridges in County 090. The average bridge in Alaska is 0 years old; this one is 38 years old.
Nearby Bridges
RICHARDSON HIGHWAY over RICH HWY OH MP 359 NB
Built 2023
RICHARDSON HIGHWAY over RICH HWY OH MP 359 SB
Built 2024
STEESE HIGHWAY over CHENA RIVER (STEESE HWY)
Built 1977
PARKS-AK HWY RAMP over E-N LOOP RAMP
Built 1994
AK HWY-PARKS RAMP over W-W RAMP OC
Built 1988
WENDELL AVENUE over CHENA RIVER (WENDELL)
Built 2021
MINNIE STREET over NOYES SLOUGH (MINNIE ST)
Built 1953
PARKS HIGHWAY over CUSHMAN ST UC
Built 1988
CUSHMAN - AK HWY over C-N RAMP OC
Built 1988
ILLINOIS/CUSHMAN over CHENA RIVER (CUSHMAN)
Built 1960
Bridge Details
- Structure #
- DAPPACWAI0XBRIA
- Year Built
- 1988
- Length
- 79.9 m (262.1 ft)
- Max Span
- 54.9 m
- Width
- 10.6 m (34.8 ft)
- Lanes
- 2
- Daily Traffic
- 1,500
- Material
- Steel Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $1,000
- Total Project Cost
- $2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.