ILLINOIS/CUSHMAN over CHENA RIVER (CUSHMAN)

MILE POINT 3.3 · County 090, Alaska · Built 1960 · 3 Lanes · 7,390 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
0390
Year Built
1960
Length
74 m (242.8 ft)
Max Span
24.4 m
Width
18.3 m (60 ft)
Lanes
3
Daily Traffic
7,390
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.