RIVER ROAD over CHENA RIVER
B/T KENNEY RD & NAUTILUS · County 090, Alaska · Built 2020 · 1 Lanes · 50 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
64.832989, -147.5768
This bridge is in worse condition than 16.1% of bridges in County 090. The average bridge in Alaska is 0 years old; this one is 6 years old.
Nearby Bridges
CHIPPEWA AVE over CLEAR CREEK
Built 2000
RICHARDSON HIGHWAY over CHANNEL B RICHARDSON HWY
Built 2002
SB-BADGER RD RAMP over CHANNEL B SB-BADGER RAMP
Built 2002
FRONTAGE ROAD over CHANNEL B NB FRONTAGE RD
Built 2002
RICHARDSON HIGHWAY over BADGER LOOP U.C.
Built 2002
RICHARDSON HIGHWAY over BADGER LOOP RD U.C.
Built 1986
RIVER ROAD over CHENA RIVER
Built 1988
RICHARDSON HIGHWAY over RICH HWY OH MP 359 NB
Built 2023
RICHARDSON HIGHWAY over RICH HWY OH MP 359 SB
Built 2024
STEESE HIGHWAY over CHENA RIVER (STEESE HWY)
Built 1977
Bridge Details
- Structure #
- DAPPACWAI0XBRCB
- Year Built
- 2020
- Length
- 77.4 m (253.9 ft)
- Max Span
- 37.8 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 1
- Daily Traffic
- 50
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $4,000
- Total Project Cost
- $7,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.