JOHANSEN EXPRESSWY over PEGER/GEIST OVERCROSSING
MILE POINT 1.0 · County 090, Alaska · Built 1993 · 5 Lanes · 18,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
64.849192, -147.775756
This bridge is in worse condition than 50% of bridges in County 090. The average bridge in Alaska is 0 years old; this one is 33 years old.
Nearby Bridges
JOHANSEN EXPRESSWY over GEIST ROAD OVERHEAD
Built 1989
PEGER ROAD over CHENA RIVER (PEGER RD)
Built 1977
JOHANSEN EXPRESSWY over NOYES SLOUGH (GEIST RD)
Built 1993
AURORA DRIVE over NOYES SLOUGH (AURORA)
Built 2024
UNIVERSITY AVE over CHENA RIVER (UNIV AVE)
Built 2021
DANBY ROAD over NOYES SLOUGH
Built 1989
BARNETTE STREET over CHENA RIVER BARNETTE ST
Built 2010
OCONNER ROAD over NOYES SLOUGH
Built 1983
ILLINOIS/CUSHMAN over CHENA RIVER (CUSHMAN)
Built 1960
JOHANSN-COLLEGE SW over NOYES SLOUGH SW RAMP
Built 1991
Bridge Details
- Structure #
- 1794
- Year Built
- 1993
- Length
- 68.2 m (223.8 ft)
- Max Span
- 65.1 m
- Width
- 34.2 m (112.2 ft)
- Lanes
- 5
- Daily Traffic
- 18,000
- Material
- Steel
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.