AURORA DRIVE over NOYES SLOUGH (AURORA)
MILE POINT 0.2 · County 090, Alaska · Built 2024 · 2 Lanes · 3,500 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
64.861278, -147.761417
This bridge is in worse condition than 6.3% of bridges in County 090. The average bridge in Alaska is 0 years old; this one is 2 years old.
Nearby Bridges
DANBY ROAD over NOYES SLOUGH
Built 1989
JOHANSEN EXPRESSWY over GEIST ROAD OVERHEAD
Built 1989
JOHANSEN EXPRESSWY over PEGER/GEIST OVERCROSSING
Built 1993
OCONNER ROAD over NOYES SLOUGH
Built 1983
JOHANSEN EXPRESSWY over NOYES SLOUGH (GEIST RD)
Built 1991
COLLEGE-JOHANSN NW over NOYES SLOUGH NW RAMP
Built 1991
JOHANSN-COLLEGE SW over NOYES SLOUGH SW RAMP
Built 1991
PEGER ROAD over CHENA RIVER (PEGER RD)
Built 1977
JOHANSEN EXPRESSWY over COLLEGE ROAD UC
Built 1991
ILLINOIS STREET over NOYES SLOUGH (ILLINOIS)
Built 2013
Bridge Details
- Structure #
- 0209
- Year Built
- 2024
- Length
- 29 m (95.1 ft)
- Max Span
- 27.5 m
- Width
- 12.9 m (42.3 ft)
- Lanes
- 2
- Daily Traffic
- 3,500
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.