TOK CUTOFF over INDIAN RIVER
MILE POINT 43.1 · County 066, Alaska · Built 1984 · 2 Lanes · 260 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
62.666406, -144.417475
This bridge is in worse condition than 28.3% of bridges in County 066. The average bridge in Alaska is 0 years old; this one is 42 years old.
Bridge Details
- Structure #
- 0651
- Year Built
- 1984
- Length
- 49.8 m (163.4 ft)
- Max Span
- 24.3 m
- Width
- 11.3 m (37.1 ft)
- Lanes
- 2
- Daily Traffic
- 260
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.