TOK CUTOFF over INDIAN RIVER

MILE POINT 43.1 · County 066, Alaska · Built 1984 · 2 Lanes · 260 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 8 Very Good
Substructure 7 Good

Location

62.666406, -144.417475

This bridge is in worse condition than 28.3% of bridges in County 066. The average bridge in Alaska is 0 years old; this one is 42 years old.

Nearby Bridges

Bridge Details

Structure #
0651
Year Built
1984
Length
49.8 m (163.4 ft)
Max Span
24.3 m
Width
11.3 m (37.1 ft)
Lanes
2
Daily Traffic
260
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.