TOK CUTOFF over SINONA CREEK

MILE POINT 34.0 · County 066, Alaska · Built 2005 · 2 Lanes · 330 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 9 Excellent
Substructure 8 Very Good

Location

62.5916, -144.638225

This bridge is in worse condition than 13.2% of bridges in County 066. The average bridge in Alaska is 0 years old; this one is 21 years old.

Nearby Bridges

Bridge Details

Structure #
0648
Year Built
2005
Length
27.7 m (90.9 ft)
Max Span
27.1 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
330
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.