TOK CUTOFF over CHISTOCHINA RIVER
MILE POINT 34.8 · County 066, Alaska · Built 2005 · 2 Lanes · 330 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 6 | Satisfactory |
Location
62.60405, -144.629169
This bridge is in worse condition than 50.9% of bridges in County 066. The average bridge in Alaska is 0 years old; this one is 21 years old.
Bridge Details
- Structure #
- 0649
- Year Built
- 2005
- Length
- 243.3 m (798.2 ft)
- Max Span
- 34.4 m
- Width
- 11.9 m (39 ft)
- Lanes
- 2
- Daily Traffic
- 330
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.