_SR 135 over _SALT LAKE CHANNEL

_0.9 MI N SR 182 · County 003, Alabama · Built 2019 · 2 Lanes · 8,559 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
021549
Year Built
2019
Length
14.6 m (47.9 ft)
Max Span
7.3 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
8,559
Material
Concrete
Design
Channel Beam
Owner
Other State Agencies
Last Inspected
N/A
Est. Improvement
$617,000
Total Project Cost
$679,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.