STATE PARK RD 2 over GULF ST PARK BOAT CANAL

0.2 MI N SR 182 · County 003, Alabama · Built 1975 · 2 Lanes · 1,372 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
018205
Year Built
1975
Length
48.8 m (160.1 ft)
Max Span
12.2 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
1,372
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Park, Forest, or Reservation Agency
Last Inspected
N/A
Est. Improvement
$1,615,000
Total Project Cost
$1,777,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.