W 21ST AVE over W 1ST ST DRAINAGE

E OF GU SH POST OFFICE · County 003, Alabama · Built 1988 · 2 Lanes · 540 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
015042
Year Built
1988
Length
7.6 m (24.9 ft)
Max Span
2.4 m
Width
16.5 m (54.1 ft)
Lanes
2
Daily Traffic
540
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$433,000
Total Project Cost
$476,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.