28TH AVE over 28TH AVE DRAINAGE

1 MI W 29TH AVE · County 003, Alabama · Built 1999 · 2 Lanes · 697 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
018340
Year Built
1999
Length
6.3 m (20.7 ft)
Max Span
3 m
Lanes
2
Daily Traffic
697
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$384,000
Total Project Cost
$422,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.