CR 92 over Higdon Creek

1.15 mi East of SR 71 · County 071, Alabama · Built 2018 · 2 Lanes · 860 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
021460
Year Built
2018
Length
21.9 m (71.9 ft)
Max Span
7.3 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
860
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$575,000
Total Project Cost
$633,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.