CO RD 823 over MILLER CREEK

1 MI W CO RT 155 2SR10E · County 049, Alabama · Built 1977 · 2 Lanes · 155 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
011864
Year Built
1977
Length
14.6 m (47.9 ft)
Max Span
7.3 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
155
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$367,000
Total Project Cost
$404,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.