CR 95 over HIDGON CREEK

10 MI S JCT SR 71 · County 071, Alabama · Built 1973 · 2 Lanes · 180 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
010990
Year Built
1973
Length
36.6 m (120.1 ft)
Max Span
7.3 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
180
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$817,000
Total Project Cost
$899,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.