MADISON PIKE over SR255

.3 MI N JCT I565/SR255 · County 089, Alabama · Built 2022 · 6 Lanes · 14,687 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
021449
Year Built
2022
Length
79.2 m (259.8 ft)
Max Span
19.8 m
Width
29.3 m (96.1 ft)
Lanes
6
Daily Traffic
14,687
Material
Prestressed Concrete
Design
Other
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,882,000
Total Project Cost
$6,470,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.