I565 TO RES PK BLV over RAMP * I565
7.2 MI N COUNTY LINE RD · County 089, Alabama · Built 1991 · 1 Lanes · 11,965 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
34.706439, -86.67375
This bridge is in worse condition than 60.4% of bridges in County 089. The average bridge in Alabama is 0 years old; this one is 35 years old.
Nearby Bridges
RESEARCH PK BLVD over I-565
Built 1990
RESEARCH PK BLVD over I-565
Built 1990
RAMP * I565 W.B. over NORHFOLK SOUTHERN R.R.
Built 1990
I-565 E.B. over NORTHFOLK SOUTHERN R.R.
Built 1990
RAMP TO SR 255*RA over NORTHFORK SOUTHERN R. R.
Built 1990
SR 255 over NORFOLK SOUTHERN
Built 1968
SR 255 over NORFOLK SOUTHERN
Built 1968
RAMP TO SR 255 N over NORFOLK SOUTHERN
Built 1991
MADISON PIKE over SR255
Built 2022
BRADFORD DRIVE over SHERWOOD BRANCH TRIB
Built 1987
Bridge Details
- Structure #
- 015315
- Year Built
- 1991
- Length
- 160.6 m (526.9 ft)
- Max Span
- 33.2 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 1
- Daily Traffic
- 11,965
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,112,000
- Total Project Cost
- $3,423,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.