RAMP * I565 W.B. over NORHFOLK SOUTHERN R.R.
0.3 MI W SR255 * I565 · County 089, Alabama · Built 1990 · 6 Lanes · 52,839 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
34.706033, -86.67675
This bridge is in worse condition than 45.8% of bridges in County 089. The average bridge in Alabama is 0 years old; this one is 36 years old.
Nearby Bridges
I-565 E.B. over NORTHFOLK SOUTHERN R.R.
Built 1990
RAMP TO SR 255*RA over NORTHFORK SOUTHERN R. R.
Built 1990
I565 TO RES PK BLV over RAMP * I565
Built 1991
RESEARCH PK BLVD over I-565
Built 1990
RESEARCH PK BLVD over I-565
Built 1990
SR 255 over NORFOLK SOUTHERN
Built 1968
SR 255 over NORFOLK SOUTHERN
Built 1968
RAMP TO SR 255 N over NORFOLK SOUTHERN
Built 1991
MADISON PIKE over SR255
Built 2022
BRADFORD DRIVE over SHERWOOD BRANCH TRIB
Built 1987
Bridge Details
- Structure #
- 015050
- Year Built
- 1990
- Length
- 21.9 m (71.9 ft)
- Max Span
- 21.9 m
- Width
- 31.4 m (103 ft)
- Lanes
- 6
- Daily Traffic
- 52,839
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,113,000
- Total Project Cost
- $2,324,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.