RAMP * I565 W.B. over NORHFOLK SOUTHERN R.R.

0.3 MI W SR255 * I565 · County 089, Alabama · Built 1990 · 6 Lanes · 52,839 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
015050
Year Built
1990
Length
21.9 m (71.9 ft)
Max Span
21.9 m
Width
31.4 m (103 ft)
Lanes
6
Daily Traffic
52,839
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,113,000
Total Project Cost
$2,324,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.