County Road 9 over Barner Branch

0.1M S of CR 28 · County 003, Alabama · Built 2020 · 2 Lanes · 2,453 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
021435
Year Built
2020
Length
36.6 m (120.1 ft)
Max Span
12.2 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
2,453
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,067,000
Total Project Cost
$1,174,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.