US 98 over FISH RIVER

9 MI W FOLEY · County 003, Alabama · Built 2006 · 2 Lanes · 9,988 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
018319
Year Built
2006
Length
518.1 m (1699.8 ft)
Max Span
30.5 m
Width
16.9 m (55.4 ft)
Lanes
2
Daily Traffic
9,988
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$19,539,000
Total Project Cost
$21,493,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.