59/20 EB Off Ramp over 3rd Street North

.27 mi. E of Center St. · County 073, Alabama · Built 2018 · 1 Lanes · 2,018 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
021146
Year Built
2018
Length
166.1 m (544.9 ft)
Max Span
42.7 m
Width
8.4 m (27.6 ft)
Lanes
1
Daily Traffic
2,018
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,211,000
Total Project Cost
$3,532,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.