BOB WADE LANE over DRY CREEK
0.2 MILE WEST PULASKI PIK · County 089, Alabama · Built 1948 · 2 Lanes · 900 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
34.822361, -86.645833
This bridge is in worse condition than 99% of bridges in County 089. The average bridge in Alabama is 0 years old; this one is 78 years old.
Nearby Bridges
BOB WADE LA over FORK OF DRY CREEK
Built 1941
PULASKI PIKE over DRY CREEK
Built 1975
Pulaski Pike over Tributary to Dry Creek
Built 1970
AL255 over STREAM
Built 2005
INNOVATION WAY over DRY CREEK
Built 2002
NICK FITCHARD RD over KELLY SPRING BRANCH
Built 1938
PULASKI PIKE over PINHOOK CREEK
Built 1970
AL 255 over STREAM
Built 2005
CEDAR POINT DR over PINHOOK CREEK
Built 1962
SR 53 over DRY CREEK
Built 2012
Bridge Details
- Structure #
- 020714
- Year Built
- 1948
- Length
- 11.6 m (38.1 ft)
- Max Span
- 3.4 m
- Width
- 6.8 m (22.3 ft)
- Lanes
- 2
- Daily Traffic
- 900
- Material
- Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $278,000
- Total Project Cost
- $306,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.