PULASKI PIKE over DRY CREEK

500 FT N of Bob Wade LN · County 089, Alabama · Built 1975 · 4 Lanes · 13,980 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
018757
Year Built
1975
Length
11.9 m (39 ft)
Max Span
3.7 m
Width
26.5 m (86.9 ft)
Lanes
4
Daily Traffic
13,980
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,301,000
Total Project Cost
$1,431,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.