BOB WADE LA over FORK OF DRY CREEK

1.7 MI E JCT ALA HWY 53 · County 089, Alabama · Built 1941 · 2 Lanes · 3,118 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
002572
Year Built
1941
Length
8.5 m (27.9 ft)
Max Span
3.7 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
3,118
Material
Masonry
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$342,000
Total Project Cost
$376,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.