TWO BRIDGE ROAD over STREAM

4 MI W OWASSA · County 035, Alabama · Built 2008 · 1 Lanes · 15 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
020247
Year Built
2008
Length
7.2 m (23.6 ft)
Max Span
1.7 m
Width
9.9 m (32.5 ft)
Lanes
1
Daily Traffic
15
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$250,000
Total Project Cost
$275,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.