CO RD 22 over I-65

3.3 MI N SR 83 · County 035, Alabama · Built 1960 · 2 Lanes · 307 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

31.495842, -86.932914

This bridge is in worse condition than 75.6% of bridges in County 035. The average bridge in Alabama is 0 years old; this one is 66 years old.

Nearby Bridges

Bridge Details

Structure #
006804
Year Built
1960
Reconstructed
1993
Length
81.1 m (266.1 ft)
Max Span
21.6 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
307
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,812,000
Total Project Cost
$1,993,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.