SR 83 over I-65

JCT I-65 * SR 83 · County 035, Alabama · Built 1960 · 2 Lanes · 9,521 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

31.457489, -86.965208

This bridge is in worse condition than 75.6% of bridges in County 035. The average bridge in Alabama is 0 years old; this one is 66 years old.

Nearby Bridges

Bridge Details

Structure #
007105
Year Built
1960
Length
80.8 m (265.1 ft)
Max Span
22.3 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
9,521
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,930,000
Total Project Cost
$2,123,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.