Martin Road over Railroad

.25 mi. E of US 231 · County 089, Alabama · Built 2016 · 4 Lanes · 10,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
019838
Year Built
2016
Length
52.1 m (170.9 ft)
Max Span
17.4 m
Width
24.2 m (79.4 ft)
Lanes
4
Daily Traffic
10,100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$3,379,000
Total Project Cost
$3,717,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.