FOUR MILE POSTROA over ALDRIDGE CREEK

1204 FOUR MILE POST RD · County 089, Alabama · Built 1968 · 3 Lanes · 12,240 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
009736
Year Built
1968
Length
25 m (82 ft)
Max Span
8.5 m
Width
17.1 m (56.1 ft)
Lanes
3
Daily Traffic
12,240
Material
Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,297,000
Total Project Cost
$1,427,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.