US 231/SR 53 over BYRD SPRINGS RD

231/BYRD SPRINGS RD · County 089, Alabama · Built 2018 · 6 Lanes · 46,345 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
020046
Year Built
2018
Length
123.4 m (404.9 ft)
Max Span
46.1 m
Width
30.2 m (99.1 ft)
Lanes
6
Daily Traffic
46,345
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,952,000
Total Project Cost
$9,847,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.