COUUNTY 29 SOUTH over TRIBUTARY TO SANDY CREEK

6 MI S E. OF EVERGREEN · County 035, Alabama · Built 2002 · 2 Lanes · 450 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
018242
Year Built
2002
Length
31.2 m (102.4 ft)
Max Span
9.8 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
450
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$816,000
Total Project Cost
$898,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.