CO RT 42 over STREAM
7MI SO.E EVERGREEN · County 035, Alabama · Built 1945 · 2 Lanes · 718 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
31.384486, -86.871417
This bridge is in worse condition than 95% of bridges in County 035. The average bridge in Alabama is 0 years old; this one is 81 years old.
Nearby Bridges
JP HOWARD DIRT RD over TRIBUTARY TO SIMMONS CK.
Built 1994
PEACE CIRCLE over BRANCH
Built 1950
HUGH HAGOOD DT RD over CREEK
Built 1994
COUNTY ROAD over STREAM
Built 1992
Lizard Lope Road over Simmons Creek
Built 2015
ST JOHN CHURCH RD over BRANCH
Built 1992
J.P. HOWARD RD. over TRIBUTARY TO SIMMONS CK.
Built 1994
CO RD 42 over CREEK
Built 1963
COUNTY ROAD 29 over MILL CREEK
Built 1998
COUNTY ROAD 42 over TRIBUTORY TO SANDY CREEK
Built 2002
Bridge Details
- Structure #
- 002836
- Year Built
- 1945
- Length
- 21 m (68.9 ft)
- Max Span
- 5.5 m
- Width
- 7.7 m (25.3 ft)
- Lanes
- 2
- Daily Traffic
- 718
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $493,000
- Total Project Cost
- $542,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.