CO RD 85 over Unnamed Tributary

2.5 MI N of CR 6 · County 035, Alabama · Built 2016 · 2 Lanes · 194 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
021265
Year Built
2016
Length
12.8 m (42 ft)
Max Span
3 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
194
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$384,000
Total Project Cost
$422,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.