AL - 53 (US 231) over LOCUST FK OF WARRIOR RIV

2.7 MI. NO. AL 160 · County 009, Alabama · Built 2007 · 2 Lanes · 6,730 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
018188
Year Built
2007
Length
164.6 m (540 ft)
Max Span
41.1 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
6,730
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,425,000
Total Project Cost
$5,968,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.