AL - 53 (US 231) over DRY BRANCH

US 231 * DRY BRANCH · County 009, Alabama · Built 1939 · 2 Lanes · 6,460 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
002022
Year Built
1939
Length
18.3 m (60 ft)
Max Span
6.1 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
6,460
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$419,000
Total Project Cost
$461,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.