DRY CREEK ROAD over DRY CREEK

1/2 MI E OF FIVE POINTS · County 009, Alabama · Built 1961 · 1 Lanes · 158 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
007498
Year Built
1961
Length
13.1 m (43 ft)
Max Span
13.1 m
Width
4.1 m (13.5 ft)
Lanes
1
Daily Traffic
158
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$177,000
Total Project Cost
$195,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.