COUNTY ROAD 4 over SPRING CREEK

3 MI EAST OF GENEVA · County 061, Alabama · Built 2002 · 2 Lanes · 2,180 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
017928
Year Built
2002
Length
85.3 m (279.9 ft)
Max Span
12.2 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
2,180
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,416,000
Total Project Cost
$2,658,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.