SR 27 MP 6.229 over DOUBLE BRIDGES CREEK

0.3 MI. E. SR 52 · County 061, Alabama · Built 1962 · 2 Lanes · 14,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
007693
Year Built
1962
Length
159.1 m (522 ft)
Max Span
24.4 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
14,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,113,000
Total Project Cost
$4,524,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.