SR 27 MP 6.765 over RELIEF BRIDGE

0.2 MI. N. SR-52 · County 061, Alabama · Built 1982 · 2 Lanes · 4,730 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
012784
Year Built
1982
Length
43.9 m (144 ft)
Max Span
7.3 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
4,730
Material
Concrete
Design
Channel Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,437,000
Total Project Cost
$1,581,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.