I-22 over Industrial Access Road

M.P. 65 on I-22 · County 127, Alabama · Built 1997 · 2 Lanes · 20,662 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
016325
Year Built
1997
Length
69.5 m (228 ft)
Max Span
34.7 m
Width
18.3 m (60 ft)
Lanes
2
Daily Traffic
20,662
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,284,000
Total Project Cost
$3,612,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.