INDUSTRIAL ACCESS over B*N RR

B * N RR · County 127, Alabama · Built 2001 · 4 Lanes · 8,390 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
017214
Year Built
2001
Length
57.9 m (190 ft)
Max Span
21.3 m
Width
25.6 m (84 ft)
Lanes
4
Daily Traffic
8,390
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$3,933,000
Total Project Cost
$4,326,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.