I-22 over NS Railroad

M.P. 62.9 on I-22 · County 127, Alabama · Built 1998 · 2 Lanes · 20,662 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

33.806639, -87.270467

This bridge is in worse condition than 23.6% of bridges in County 127. The average bridge in Alabama is 0 years old; this one is 28 years old.

Nearby Bridges

Bridge Details

Structure #
016322
Year Built
1998
Length
417.6 m (1370.1 ft)
Max Span
30.2 m
Width
17.9 m (58.7 ft)
Lanes
2
Daily Traffic
20,662
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$16,607,000
Total Project Cost
$18,268,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.