I-65 over MAIN STREET

0.6 MI N US 45 · County 097, Alabama · Built 1965 · 8 Lanes · 78,895 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
015502
Year Built
1965
Reconstructed
1992
Length
51.5 m (169 ft)
Max Span
19.5 m
Width
45.3 m (148.6 ft)
Lanes
8
Daily Traffic
78,895
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,265,000
Total Project Cost
$6,892,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.